Acala: Wormhole Bridge is temporarily restarted, and the closure time is extended to July 14. Assets need to be redeemed ASAP.
2025-07-01 06:15:45
Acala announced in a post on the X platform that the Wormhole bridge of Acala and Karura was temporarily restarted to allow users to redeem assets, and the final closure time was extended to July 14. Acala previously said that Wormhole unilaterally announced that it would stop bridging services to Acala and Karura, which means that users will no longer be able to send Wormhole encapsulated assets from these networks. The initial outage time was June 18.
Disclaimer:
1. The information provided does not constitute investment advice. Investors should make independent decisions and bear all risks themselves.
2. The copyright of this content belongs to the original author. The views expressed herein are solely those of the author and do not represent the stance or position of this website.
Previous article:
Acala:Wormhole桥接临时重启,关闭时间延至7月14日,需尽快赎回资产Next article:
日本游戏公司CyberStep进军加密资产投资,计划投入最高10亿日元